Past Paper attempts
Threads
- 2009 Q6 LEGISLATION, STANDARDS & PRACTICE (5 Replies)
- 2009 Q5 SAFETY ASSURANCE THROUGH LIFE CYCLE PHASES (10 Replies)
- 2009 Q7 TRAIN OVERRUN SIGNAL (10 Replies)
- 2011 Q1 Level Crossing Risk (1 Reply)
- 2011 Q4 Recording information for diagnostic and investigative purposes (1 Reply)
- 2011 Q3 Degraded mode working in an area (1 Reply)
- 2011 Q5 Minimising risk in event of cable theft (1 Reply)
- 2011 Q2 Traversing points safely at speed (2 Replies)
- 2011 Q8 Risks to staff working at a trackside location (0 Replies)
- 2011 Q7 Risk of Human Error affecting safety (0 Replies)
- 2011 Q6 Introduction of New Products (0 Replies)
- 2010 Q10 Environmental factors which influence design of S&T equipment (4 Replies)
- 2007 Q4 CROSS-ACCEPTANCE (10 Replies)
- 2010 Q9 Degraded working at mechanical signalbox (9 Replies)
- 2010 Q1 Introduction of novel equipment (1 Reply)
- 2010 Q8 - Design Error Management in Commissioning Phase (9 Replies)
- 2010 Q2 Comparing NX Interface versus Video Based System (1 Reply)
- 2010 Q3 Track Circuit SCWO (3 Replies)
- 2009 Q8 RISK ASSESSMENT OF WRONG DIRECTION RUNNING (7 Replies)
- 2008 Q8 RISKS OF MAINTENANCE AND FAILURE OF TBS (2 Replies)