11-07-2013, 12:56 PM
Thanks- proof that the IRSE xam is all about being able to demonstrate experience and knowledge and that preparation is about digging out stuff and sharing it; also that none of us are too old or have been about too much to be able to learn!
(11-07-2013, 09:22 AM)dorothy.pipet Wrote: "I wouldn't have thought to note that wide-to-gauge to have TCIs on the switch rails;"
I came across this one on the Temple Mills Depot project - the CTRL depot near Stratford. My colleage, Mr Henson, has a good picture of them on his office wall. The arrangement is shown on the follwing drawings:
PJW