Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
2. Mod 7, chapter 1
#1
This week's presentation- split into 2 portions for size reasons.
Also the homework schedule and the encouragement to do it.

Oops- typo re the year for the next Mod 1 question quoted in chapter 3. It should be-
2000 Q4: Using examples, explain how reliability, availability, maintainability and safety (RAMS) are assured for the life cycle of a signalling or telecommunications installation through consideration during design.


Attached Files
.ppt   Mod 7 session 1 13016 part2.ppt (Size: 1.54 MB / Downloads: 55)
.docx   Encouraging contributions.docx (Size: 39.66 KB / Downloads: 37)
.ppt   Mod 7 session 1 13016 part1.ppt (Size: 2.52 MB / Downloads: 55)
.doc   Homework for forthcoming sessions 130117.doc (Size: 42.5 KB / Downloads: 42)
PJW
Reply


Forum Jump:


Users browsing this thread: 1 Guest(s)