Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
2004 Q3 NEW ATP AND SIL REQUIREMENT
#1
Again I shared my old answer with the Study Group, Mr Fenner has added to it in red.

When I studied for the exam I used this table to learn about the key points for a Cab Signalling question. I could literally reproduce the table in 8(?) minutes flat, but I also understood it, so I could draw on the knowledge to answer an essay question. It is apparent when reading that I had systems in mind, these were:

NR lineside signals and TPWS - OSS and TSS;
NR lineside signals, & BR ATP or Level 1 ETCS; &
Level 2 ETCS no overlay on a high speed line.

Of course I would of stated these assumptions to add context to my answers, various of my comments are not valid for Level 2 ETCS no overlay on a slow windy little single line with lots of locally monitorred level crossings.


Attached Files
.doc   Mod 1 - 2004 Q3 DY 070528.doc (Size: 79 KB / Downloads: 161)
Reply
#2
2004 Question paper FYI


Attached Files
.pdf   2004Module1Exam.pdf (Size: 81.78 KB / Downloads: 20)
Reply


Forum Jump:


Users browsing this thread: 1 Guest(s)