TheSmoothlima's Forum Info |
Joined: |
24-01-2017 |
Last Visit: |
25-07-2017, 05:22 PM |
Total Posts: |
1 (0 posts per day | 0.02 percent of total posts)
(Find All Posts)
|
Total Threads: |
0 (0 threads per day | 0 percent of total threads) |
Time Spent Online: |
52 Minutes, 35 Seconds |
Members Referred: |
0 |
Reputation: |
0
[Details] |
|
|
Additional Info About TheSmoothlima |
Exam intentions: |
- Module 4
- Module 5
- Module 7
|
IRSE member (class)?: |
Associate Member |
Job Role: |
Project Engineer |
Location: |
Manchester |
Railway Administration: |
UK Mainline (Network Rail) |
Bio: |
Graduate of NWR Signalling apprenticeship programme.
6 Years as a Senior S&T Technician on Manchester Metrolink, working on a variety of signalling and telecoms equipment.
1 Year as a Assistant Project Engineer - Signalling in York working on TDM renewals / recontrol to York ROC (inc FTNx).
Currently Project Engineer - Signalling in Manchester, working on schemes ranging from new stations, Line speed improvements and train lengthening schemes. |
Sex: |
|
English : |
|
|